Project Description:
Installation of six Light Oil Test Stations (LOTS), one Light Oil Pump Station (LOPS), and 179 production flowlines, production group line and gas piping systems.
Commercial Structure:
Lump Sum contract – $6,165,000
Key Quantities:
- Installation of 151,120 ft of 2” flow lines
- Connection to 179 different wells
- 6 Test Stations
- 1 pump station
Schedule:
12 Month duration