Skip to content

City of Oroville

Project Description:

The City of Oroville project was installed at the City’s Corporation Yard. This 459.9kW project consisted of 5 solar carport structures with a 17 ft minimum clear height for the city’s larger equipment fleet. Due to the nearby delta, the riverbed like soil conditions would not allow for the standard CIDH pier. Columns had to be installed utilizing spread footings.